Contracting SMEs.
Sixteen trades.
An electrical contractor doesn't run like a piling firm. Generic software ignores that. Moorstack doesn't.
Where we go deep.
Each trade has its own compliance, claim formats, and site routines. We've mapped them, so your platform knows how your trade runs, not guesses.
- ElectricalCIDB / JKR / TNB-registered
- M&EMechanical & Electrical
- Fire protectionBOMBA-compliant
- ACMV / HVAC
- Plumbing & sanitary
- ELVCCTV, ACS, data cabling
- Solar PVRenewable energy
- InstrumentationBMS, SCADA
- Interior fit-out & renovation
- Aluminium, glazing & facade
- Waterproofing
- Steel fabrication
- Piling, foundation & earthworks
- Roofing & cladding
- General building (CIDB G3-G5)
- Commercial painting
Sole trader, distributor, developer, or pure consultancy? Not a fit, and we'll say so on the first call.
The same trades, in plant.
Instrumentation, ELV, M&E, fire protection and steel fabrication do not stop at the site boundary. A good part of the year is spent inside refineries, terminals and tank farms, and on shutdowns that have to hand the plant back on the date they said they would.
The trade is the same. What changes is how hard the claim gets read, and how much of the work was never in the original order. Section 4 of CIPAA 2012 names oil, gas and petrochemical work as construction work, so the same statutory clocks run on it.
Onshore only. Offshore and upstream work is not ours, and we say why. Oil and gas contractors
The rules and the risks are
already on your desk.
Not our claims. The world your firm already works in. Verifiable, and the reason systems stopped being optional.
is the statutory payment period when your contract is silent on it. The clock runs whether or not anyone is counting.
CIPAA 2012, section 36
Malaysian construction projects hit late, short, or non-payment. The wait to get paid is the norm.
Planning Malaysia Journal
in construction payment went to adjudication in 2023 alone, money owed, withheld, and fought over.
AIAC / CIPAA adjudication, 2023
Your trade on the list?
Thirty minutes. We'll walk through how your firm runs and say straight whether a custom platform is the right move.